Northline Markets · Commodities

Potash (potassium chloride)

The price of potassium chloride fertiliser per metric tonne.

Latest value357.50US$ per mt
Observation date2026-10
Change, 1 year+1.6%from 352.00 on 2025-10
Change, 5 years-54.3%from 782.00 on 2021-10

Monthly average, delayed Observed 2026-10 · retrieved 2026-11-05 · Source: World Bank Commodity Price Data (Pink Sheet) · Not a live quote.

History

Potash (potassium chloride) over time

Monthly observations. Use the period buttons to change the range; the table beneath the chart lists the values.

Potash (potassium chloride)

US$ per mt. US dollars; monthly average.

Chart loads when it comes into view.

Latest values: Potash (potassium chloride) 357.5 (2026-10).

Quotation convention. US dollars; monthly average.

What it measures

What this indicator is and why it is watched

What it measures

The price of potassium chloride fertiliser per metric tonne.

Why it is watched

Saskatchewan is among the world's largest potash producers.

Economic context

How it connects to the wider economy

Context, not a claim of cause.

The series is the World Bank price quoted for a specific market and may differ from contract prices.

Northline describes relationships as documented mechanisms, statistical associations or hypotheses. Nothing on this page states that a movement in this indicator caused a movement in another.

Method and source

How the data are produced

Publisher
World Bank Commodity Price Data (Pink Sheet)
Dataset
Pink Sheet (monthly prices)
Frequency
Monthly
Unit
US$ per mt
Observations
442 (long history)
Retrieved
2026-11-05
Series id
gl13_potassium_chloride

Monthly average prices from the World Bank Commodity Price Data (Pink Sheet). They are monthly averages, not live or daily quotes, and are in US dollars.

Source: World Bank, Commodity Price Data (The Pink Sheet), Potassium chloride, updated November 03, 2026. CC BY (version per the Bank licence page); no changes to values.

Licence conditions: see source terms: https://datacatalog.worldbank.org/public-licenses; attribution required.

Missing observations are left missing and are never interpolated. Statistical agencies can revise published values; the observation date and retrieval date above identify the version shown. Methodology and sources.

Investigate

Take it into Intelligence Studio

Add this indicator to a workspace with related series and the recorded relationships.

In Studio, the Scenarios tab can ask a what-if question about this indicator. Scenario Intelligence applies its usual checks: when there is too little history, the series are not comparable or the relationship is not stable, it reports “not enough evidence” rather than a number.